Pure epoxy resin clear sealer.
Ready for traffic within 12 hours
Good for use above 15°c
Good resistance to foot and forklift traffic
Easy to keep clean
Easy to apply
Preparation
Ensure floor is clean, dry and clear of debris.
Mixing
Mix the two components of the unit in a mixing bucket or alternatively poor the contents of the hardener into the base container and mix thoroughly.
Application
Once a good consistency has been achieved apply onto the desired area with a roller and brush.
Notes:
All coverage rates for coatings are subject to the following:
Surfaces must be smooth, clean and clear of debris. If painting on to an existing coating ensure it is well bonded and has been appropriately prepared before the application of a new coating. Application to be carried out immediately after the completion of mixing as pot life of product is limited. Temperature must be at a sensible level. For optimum coverage rates all coating products application must be carried out between 5 degrees centigrade and 25 degrees centigrade (excluding ZenRite Coat Cold which can be applied down to 0 degrees centigrade).
All coverage rates for screeds are subject to the following:
The surface must be clean, appropriately prepared and clear of debris. Temperature must be at a sensible level. Application to be carried out immediately after the completion of mixing as pot life of product is limited.
We recommend all mixing to be carried out with a slow speed electric mixer. Mixing paddles are available from ZenRite.
Delivery on standard coloured products, workwear and accessories is 2-3 days. If this delivery time cannot be fulfilled due to stock levels or if a bespoke or non-standard colour has been requested you will be notified by email with expected delivery times.